PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Chugoku Electric Power Co. ,Inc

中国電力株式会社

Offtaker:

HOKUTO Corporation

ホクト株式会社

Industry:

Agriculture

Capacity and generation

T&D area:

Chugoku

Technology:

Solar

Capacity:

2.302MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Live

Disclosed:

January 11, 2021

COD:

2022/04 (expected)

Duration:

Undisclosed

Additional details

  • Chugoku EPCO and an undisclosed business partner will build a solar power plant at Hokuto’s Hiroshima Mushroom Center in Mihara City, Hiroshima Prefecture
  • The generated power is expected to account for approximately 18% of the facility’s consumption