PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

NTT Anode Energy Corporation

NTTアノードエナジー株式会社

Offtaker:

Furukawa Electric

古河電気工業株式会社

Industry:

Metal Manufacturing

Capacity and generation

T&D area:

Kansai

Technology:

Solar

Capacity:

0.853MW (DC)

Inverter:

-

Generation:

0.974GWh/year

Status and timeline

Status:

Live

Disclosed:

April 23, 2021

COD:

April 15, 2021

Duration:

30

Additional details

  • NTT Anode Energy installed a solar power plant at Furukawa Electric’s Mie Branch in Kameyama City, Mie Prefecture

Image(s)

NTT Anode Energy Corporation's other PPAs

Furukawa Electric's other PPAs