Model:

Physical (on-site)

Generator:

Tokyo Gas Engineering Solutions Corporation

東京ガスエンジニアリングソリューションズ株式会社

Offtaker:

Honda Motor Company

本田技研工業株式会社

Industry:

Automotive

Capacity and generation

T&D area:

Kyushu

Technology:

Solar

Capacity:

7.1MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Live

*

Disclosed:

October 4, 2021

COD:

FY2021 - FY2024

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • Tokyo Gas Engineering Solutions gradually developed multiple solar power plants totaling 3.8MW by FY2021 end, 5.8MW by FY2022 end, and 7.0MW by FY2023 end and installed a 20MWh storage battery at Honda’s Kumamoto Factory
  • The power plants include both rooftop (3.8MW+1.2MW) and carports (0.8MW+3.8MW)

Image(s)

Tokyo Gas Engineering Solutions Corporation's other PPAs

Honda Motor Company's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.