PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Clean Energy Connect, Inc.

株式会社クリーンエナジーコネクト

Retailer:

Smart Eco Energy Co., Ltd.

スマートエコエナジー株式会社

Offtaker:

Shimizu Corporation

清水建設株式会社

Industry:

Construction

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

1.028MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Live

*

Disclosed:

December 2, 2021

COD:

2022/04 (expected)

Duration:

20

* Presumed live based on the expected COD.

Additional details

  • Clean Energy Connect will build and operate 12 low-voltage solar power plants in Gunma, Saitama, Ibaraki, and Tochigi Prefectures, and supply power to three office buildings in the Tokyo T&D area owned by Shimizu Corporation
  • The three office buildings powered by this PPA include Akihabara I-Mark Building, Iidabashi I-Mark Building, and Shimbashi I-Mark Building
  • Power conditioner output of 567kW
  • The project was selected as one of the Ministry of Environment’s “R3 Solar Off-site Corporate PPA Model” demonstration projects

Clean Energy Connect, Inc.'s other PPAs

Shimizu Corporation's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.