PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

SMFL MIRAI Partners Co., Ltd.

SMFLみらいパートナーズ株式会社

Offtaker:

Asahi Breweries, Ltd.

アサヒビール株式会社

Industry:

F&B Manufacturing

Capacity and generation

T&D area:

Chubu

Technology:

Solar

Capacity:

0.549MW (DC)

Inverter:

-

Generation:

0.673GWh/year

Status and timeline

Status:

Live

*

Disclosed:

January 6, 2022

COD:

2022/03 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • SMFL Mirai Partners will develop a solar power plant on the rooftop of a warehouse at Asahi Breweries’ Nagoya Factory
  • This is Asahi Group’s first PPA