PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Hokuriku Electric Power Biz Energy Solution Co., Ltd.

北陸電力ビズ・エナジーソリューション株式会社

Offtaker:

Fukui Byora Co., Ltd.

福井鋲螺株式会社

Industry:

-

Capacity and generation

T&D area:

Hokuriku

Technology:

Solar

Capacity:

2.46MW (DC)

Inverter:

1.667MW (AC)

Generation:

2.374GWh/year

Status and timeline

Status:

Live

Disclosed:

February 1, 2022

COD:

By February 1, 2022

Duration:

20

Additional details

  • Hokuriku Electric Power Biz Energy Solution will develop solar power plants at Fukui Byora’s Hosoroki Branch (Awara City, Fukui Prefecture) and Kaga Factory (Kaga City, Ishikawa Prefecture):
    • Hosoroki Branch No. 1 Building: 822kW DC
    • Hosoroki Branch No. 8 and No.9 Buildings: 756kW DC
    • Kaga Factory: 581kW DC
  • Hokuriku EPCO will supply the power not covered by this PPA

Image(s)

Hokuriku Electric Power Biz Energy Solution Co., Ltd.'s other PPAs

Fukui Byora Co., Ltd.'s other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.