PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

NTT Anode Energy Corporation

NTTアノードエナジー株式会社

Offtaker:

NTT Docomo

株式会社NTTドコモ

Industry:

Information Technology

Capacity and generation

T&D area:

Chugoku

Technology:

Solar

Capacity:

2.8MW (DC)

Inverter:

-

Generation:

3GWh/year

Status and timeline

Status:

Live

*

Disclosed:

March 29, 2022

COD:

2022/04 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • NTT Anode Energy will build a new solar power plant in Tottori City, Tottori Prefecture, to supply power to NTT Docomo’s Okayama Building
  • This PPA combined with additionally purchased renewable energy credits will result in 100% of the building’s power consumption being renewable

Image(s)

NTT Anode Energy Corporation's other PPAs

NTT Docomo's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.