PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Shin-Idemitsu Co., Ltd.

株式会社新出光

Offtaker:

Kyushu Railway Company

九州旅客鉄道株式会社

Industry:

Railway

Capacity and generation

T&D area:

Kyushu

Technology:

Solar

Capacity:

-

Inverter:

-

Generation:

Status and timeline

Status:

Live

Disclosed:

April 1, 2022

COD:

April 1, 2022

Duration:

Undisclosed

Additional details

  • Shin-Idemitsu will develop a solar power plant at JR Kyushu Nagasaki Branch’s Nagasaki Construction Facility
  • The generated power will be consumed at the facility