PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Mitsui & Co. Plant Systems, Ltd.

三井物産プロジェクトソリューション株式会社

Offtaker:

FP Corporation

株式会社エフピコ

Industry:

-

Capacity and generation

T&D area:

Chubu

Technology:

Solar

Capacity:

1.826MW (DC)

Inverter:

-

Generation:

2.137GWh/year

Status and timeline

Status:

Live

*

Disclosed:

April 4, 2022

COD:

2022/10 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • Mitsui & Co. Plant Systems will develop rooftop solar power plants on three FP Corporation facilities in Wanouchi Town, Gifu Prefecture:
    • Chubu Hub Center No. 1 Center No. 1 Building (749kW capacity, 877MWh annual generation)
    • Chubu Hub Center No. 1 Center No. 2 Building (568kW capacity, 665MWh annual generation)
    • Chubu Eco Pet Plant (509kW capacity, 595MWh annual generation)
  • The generated power will be used at the company’s Chubu Recycling Plant located within the same premises as the two facilities above; it is expected to cover 100% of the plant’s consumption

Mitsui & Co. Plant Systems, Ltd.'s other PPAs

FP Corporation's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.