PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Chubu Electric Power Co.,Inc.

中部電力株式会社

Retailer:

Chubu Electric Power Miraiz

中部電力ミライズ株式会社

Offtaker:

Shizuoka Bank

株式会社静岡銀行

Industry:

Financial

Capacity and generation

T&D area:

Chubu

Technology:

Solar

Capacity:

1.99MW (DC)

Inverter:

-

Generation:

2.9GWh/year

Status and timeline

Status:

Live

Disclosed:

May 20, 2022

COD:

2023/10

Duration:

Undisclosed

Additional details

  • The power is generated at Chubu EPCO’s “Shizugin Solar Park” power plant built in Shimizu Ward, Shizuoka City, specifically for this PPA
  • Power supply was originally scheduled to start in September 2023 but eventually started in October 2023
  • The power is enough to cover consumption at approximately 40 branches
  • Shizuoka Bank’s consumption has been 100% renewable (including renewable energy credit purchases) since June 2023

Image(s)

Chubu Electric Power Co.,Inc.'s other PPAs

Shizuoka Bank's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.