PPA overview

Contract model and parties

Model:

Physical (hybrid on-/off-site)

Generator:

Chugoku Electric Power Co. ,Inc

中国電力株式会社

Retailer:

Chugoku Electric Power Co. ,Inc

中国電力株式会社

Offtaker:

Mitsubishi Heavy Industries, Ltd.

三菱重工業株式会社

Industry:

Machinery

Capacity and generation

T&D area:

Chugoku

Technology:

Solar

Capacity:

10MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Live

*

Disclosed:

June 22, 2022

COD:

By FY2023 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • Chugoku EPCO will develop a 10MW-class solar power plant at Mitsubishi Heavy Industries Mihara Machinery Works’ Wadaoki Plant in Mihara City, Hiroshima Prefecture
  • Excess power not consumed at the Wadaoki Plant will be supplied to Mihara Machinery Works’ Itosaki Kohama Plant in the same city; if there is additional excess power, it will be supplied to other Mitsubishi Heavy Industries plants
  • This PPA will be used to make 100% of power consumption at Mitsubishi Heavy Industries’ Mihara Machinery Works (at Wadaoki Plant and Itosaki Kohama Plant) renewable

Chugoku Electric Power Co. ,Inc's other PPAs

Mitsubishi Heavy Industries, Ltd.'s other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.