PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Renewable Japan Co., Ltd.

リニューアブル・ジャパン株式会社

Offtaker:

Taramizu City

垂水市

Industry:

Municipality

Capacity and generation

T&D area:

Kyushu

Technology:

Solar

Capacity:

0.1265MW (DC)

Inverter:

0.088MW (AC)

Generation:

Status and timeline

Status:

Live

*

Disclosed:

August 29, 2022

COD:

February 2023 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • Renewable Japan will develop solar power plants at two facilities owned by Tarumizu City in Kagoshima Prefecture; both are expected to enter into service around February 2023:
    • Tarumizu Central Hospital (69.76kW DC/49.50kW AC)
    • Cosmos En Nursing Home (56.70kW DC/38.50kW AC)

Renewable Japan Co., Ltd.'s other PPAs

Taramizu City's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.