PPA overview

Contract model and parties

Model:

Virtual

Generator:

Kamisato Construction Co., Ltd.

株式会社上里建設

Offtaker:

Ricoh

株式会社リコー

Industry:

Electrical Manufacturing

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

1.25MW (DC)

Inverter:

-

Generation:

2.24GWh/year

Status and timeline

Status:

Live

*

Disclosed:

December 7, 2022

COD:

2023/08 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • Eco Kamiken will supply renewable energy credits from FIP power plants to Ricoh Technology Center in Ebina City, Kanagawa Prefecture
  • The procured renewable energy credits will cover approximately 8% of the facility’s consumption (approximately 0.5% of Ricoh Group’s total consumption)

Kamisato Construction Co., Ltd.'s other PPAs

Ricoh's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.