PPA overview

Contract model and parties

Model:

Virtual

Generator:

Kamisato Construction Co., Ltd.

株式会社上里建設

Offtaker:

Ricoh

株式会社リコー

Industry:

Electrical Manufacturing

Capacity and generation

T&D area:

Multiple

Technology:

Solar

Capacity:

1.25MW (DC)

Inverter:

-

Generation:

2.24GWh/year

Status and timeline

Status:

Live

*

Disclosed:

December 7, 2022

COD:

2023/08 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • The virtual PPA was coordinated by Digital Grid
  • The power plant that is part of this PPA was constructed in Iizuka City, Fukuoka Prefecture, and operates under the FIP scheme
  • The plant’s production is expected to account for approximately 0.5% of Ricoh Group’s 2021 consumption

Kamisato Construction Co., Ltd.'s other PPAs

Ricoh's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.