PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Agri-gascom Co.,Ltd.

アグリガスコム株式会社

Retailer:

Chubu Electric Power Miraiz

中部電力ミライズ株式会社

Offtaker:

OSG

オーエスジー株式会社

Industry:

Machinery

Capacity and generation

T&D area:

Chubu

Technology:

Solar

Capacity:

4.5MW (DC)

Inverter:

-

Generation:

5.2GWh/year

Status and timeline

Status:

Live

*

Disclosed:

December 13, 2022

COD:

2023/03 (expected)

Duration:

20

* Presumed live based on the expected COD.

Additional details

  • Agri-gascom will develop 10 solar power plants in Toyokawa City, Aichi Prefecture as part of this PPA
  • The power will be supplied to four OSG factories in the city including the OSG Oike Factory
  • The power from this PPA will account for approximately 5% of OSG factories’ power consumption
  • Six of the power plants will be agrisolar on abandoned farmland that will be revived and used to grow vegetables, fruits, grains, etc.