PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

MCKB Energy Service Co., Ltd.

MCKBエネルギーサービス株式会社

Offtaker:

Kyowa Kirin Co., Ltd.

協和キリン株式会社

Industry:

Pharmaceutical Manufacturing

Capacity and generation

T&D area:

Chugoku

Technology:

Solar

Capacity:

1.47MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Live

*

Disclosed:

December 22, 2022

COD:

2023/03 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • MCKB Energy Service will develop a solar power plant at Kyowa Kirin’s Ube Factory in Ube City, Yamaguchi Prefecture
  • The generated power will be consumed at the factory

MCKB Energy Service Co., Ltd.'s other PPAs

Kyowa Kirin Co., Ltd.'s other PPAs