PPA overview

Contract model and parties

Model:

Virtual

Generator:

Clean Energy Connect, Inc.

株式会社クリーンエナジーコネクト

Offtaker:

Tokyu Construction

東急建設株式会社

Industry:

Construction

Capacity and generation

T&D area:

-

Technology:

Solar

Capacity:

4MW (DC)

Inverter:

-

Generation:

4.4GWh/year

Status and timeline

Status:

Live

Disclosed:

December 22, 2022

COD:

2023/04

Duration:

20

Additional details

  • Clean Energy Connect will build 47 low-voltage solar power plants as part of the PPA and sell the renewable energy certificates from their generation to Tokyu Construction; the power will be sold into the wholesale market
  • This PPA is expected to reduce power consumption-related CO2 emissions from Tokyu Construction’s construction sites by approximately 20%
  • The first virtual PPA in Japan to supply power to construction sites

Clean Energy Connect, Inc.'s other PPAs

Tokyu Construction's other PPAs

Monthly Report - The Japanese Power Industry Executive