PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Wire Energy Co., Ltd.

株式会社ワイヤーエナジー

Offtaker:

Step Up Co-Op Tokushima

株式会社ステップアップコープとくしま

Industry:

Others

Capacity and generation

T&D area:

Shikoku

Technology:

Solar

Capacity:

0.159MW (DC)

Inverter:

-

Generation:

0.182GWh/year

Status and timeline

Status:

Live

*

Disclosed:

January 10, 2023

COD:

By 2023/02 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • Solar panels will be installed on three Step Up Co-Op Tokushima buildings
    • Building #1: 61.56kW panel output; 49.5kW power conditioner output; expected annual generation of 70,794kWh; 26,117kWh expected to be consumed at the facility with the remainder sold through a FIT contract at 12 yen/kWh; expected to enter into service at the end of January 2023
    • Building #2: 91.58kW panel output; 49.5kW power conditioner output; expected annual generation of 105,317kWh; 69,356kWh expected to be consumed at the facility with the remainder sold through a FIT contract at 11 yen/kWh; expected to enter into service at the end of February 2023
    • Building #3: 6.08kW panel output; 6.6kW power conditioner output; expected annual generation of 5,992kWh; all generated power to be used at the facility; expected to enter into service at the end of February 2023

Wire Energy Co., Ltd.'s other PPAs

Step Up Co-Op Tokushima's other PPAs