PPA overview

Contract model and parties

Model:

Physical (hybrid on-/off-site)

Generator:

Chubu Electric Power Miraiz

中部電力ミライズ株式会社

Retailer:

Chubu Electric Power Miraiz

中部電力ミライズ株式会社

Offtaker:

Brother

ブラザー工業株式会社

Industry:

Electrical Manufacturing

Capacity and generation

T&D area:

Chubu

Technology:

Solar

Capacity:

0.6MW (DC)

Inverter:

-

Generation:

0.6GWh/year

Status and timeline

Status:

Live

*

Disclosed:

January 23, 2023

COD:

2023/02 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • Chubu Electric Power Miraiz installed a solar power plant on Brother Minato No.1 Warehouse’s rooftop in Nagoya City, Aichi Prefecture, where a portion of the generated power will be used
  • Additionally, the generated power will also be supplied to Brother Museum and Brother Headquarters Building, both in Nagoya City, Aichi Prefecture
  • First hybrid on-/off-site PPA in the Chubu T&D area

Image(s)

Chubu Electric Power Miraiz's other PPAs

Brother's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.