PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TG Power Inc.

株式会社TGパワー

Offtaker:

Live Garden

株式会社ライブガーデン

Industry:

Entertainment

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

0.291MW (DC)

Inverter:

0.255MW (AC)

Generation:

0.299GWh/year

Status and timeline

Status:

Live

Disclosed:

March 29, 2023

COD:

2023/02

Duration:

Undisclosed

Additional details

  • TG Power developed a solar power plant on Live Garden Tochigi Main Branch’s rooftop; a 15kWh battery was also added
  • The project received the “project for the promotion of price reduction of solar power generation equipment, etc. to achieve storage parity” subsidy from the Ministry of Environment

Image(s)

TG Power Inc.'s other PPAs

Live Garden's other PPAs

Monthly Report - The Japanese Power Industry Executive