PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

West Energy Solution Inc.

株式会社ウエストエネルギーソリューション

Offtaker:

Kyushu Railway Company

九州旅客鉄道株式会社

Industry:

Railway

Capacity and generation

T&D area:

Kyushu

Technology:

Solar

Capacity:

0.13MW (DC)

Inverter:

-

Generation:

0.14GWh/year

Status and timeline

Status:

Live

*

Disclosed:

April 3, 2023

COD:

2024/04 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • West Energy Solution developed a solar power plant at JR Kyushu Nagasaki Branch’s Sasebo Vehicle Center
  • The generated power will be consumed at the facility