The Japan Power Industry Executive February 2025 issue is available now!
Model:
Physical (on-site)
Generator:
West Energy Solution Inc.
株式会社ウエストエネルギーソリューション
Offtaker:
Kyushu Railway Company
九州旅客鉄道株式会社
Industry:
Railway
T&D area:
Kyushu
Technology:
Solar
Capacity:
0.13MW (DC)
Inverter:
-
Generation:
0.14GWh/year
Status:
Live
*
Disclosed:
April 3, 2023
COD:
2024/04 (expected)
Duration:
Undisclosed
* Presumed live based on the expected COD.
Submit the form below to receive a sample issue of The Japan Power Industry Executive.