PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TESS Engineering Co., Ltd.

テス・エンジニアリング株式会社

Offtaker:

Haruna Produce

ハルナプロデュース株式会社

Industry:

F&B Manufacturing

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

0.41528MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Live

Disclosed:

April 21, 2023

COD:

2023/02

Duration:

Undisclosed

Additional details

  • TESS Engineering installed 716 580W Hanwha Q CELLS panels on Haruna Produce Haruna Plant’s rooftop in Takasaki City, Gunma Prefecture