PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TN Cross Corporation

TNクロス株式会社

Offtaker:

Shiroi City

白井市

Industry:

Municipality

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

-

Inverter:

-

Generation:

Status and timeline

Status:

Live

Disclosed:

June 23, 2023

COD:

2024/03 (expected)

Duration:

20

Additional details

  • TN Cross, in collaboration with Keiyo Gas, will build a solar power plant and storage battery at the main and east buildings of Shirai City Hall and the Shirai City Health and Welfare Center in Chiba Prefecture
  • The capacity will be determined based on a site survey and has not been disclosed at this stage
  • The PPA operator was selected through a public call for proposals from Shirai City

TN Cross Corporation's other PPAs

Shiroi City's other PPAs

Monthly Report - The Japanese Power Industry Executive