PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Harebare G.K.

合同会社HARE晴れ

Retailer:

Hokkaido Electric Power Co., Inc.

北海道電力株式会社

Offtaker:

Aeon Hokkaido

イオン北海道株式会社

Industry:

Retail

Capacity and generation

T&D area:

Hokkaido

Technology:

Solar

Capacity:

12MW (DC)

Inverter:

-

Generation:

20GWh/year

Status and timeline

Status:

Partially live

*

Disclosed:

August 4, 2023

COD:

January 31, 2024 - 2025/03 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • Aeon Hokkaido will use the procured power at ten of its stores in Hokkaido
  • Harebare will build six 2 MW DC solar power plants, the first of which was put into service in Kita-Hiroshima on January 31, 2024
  • Harebare is a joint venture between Hokkaido EPCO and ARC Co., Ltd. established on July 21, 2023
  • According to Hokkaido EPCo, this is one of the largest offsite PPA projects in Hokkaido

Image(s)

Harebare G.K.'s other PPAs

Aeon Hokkaido's other PPAs

Monthly Report - The Japanese Power Industry Executive