PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Chubu Electric Power Miraiz

中部電力ミライズ株式会社

Offtaker:

Okuwa

株式会社オークワ

Industry:

Retail

Capacity and generation

T&D area:

Chubu

Technology:

Solar

Capacity:

2.3MW (DC)

Inverter:

-

Generation:

2.1GWh/year

Status and timeline

Status:

Live

Disclosed:

August 7, 2023

COD:

2023/08

Duration:

Undisclosed

Additional details

  • Chubu Electric Power Miraiz built a power plant dedicated to this PPA in Nagano Prefecture from where it is supplying six Super Center Okuwa stores
  • The six stores powered through this PPA include Kani Mitake IC and Kani Sakado in Kani City, Gifu Prefecture; Mino IC (Mino City, Gifu Prefecture); South Kameyama (Kameyama City, Mie Prefecture); Mie Asahi IC (Asahi Town, Mie Prefecture); Koda (Koda Town, Aichi Prefecture)
  • This PPA follows an onsite PPA commissioned in April 2022 which powers the chain’s eight other stores

Image(s)

Chubu Electric Power Miraiz's other PPAs

Okuwa's other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.