Hokuriku Electric Power Biz Energy Solution Co., Ltd.
北陸電力ビズ・エナジーソリューション株式会社
Retailer:
Hokkaido Electric Power Co., Inc.
北海道電力株式会社
Offtaker:
Multiple
複数
Industry:
-
Capacity and generation
T&D area:
Hokkaido
Technology:
Solar
Capacity:
2.198MW (DC)
Inverter:
-
Generation:
2.4GWh/year
Status and timeline
Status:
Live
*
Disclosed:
August 24, 2023
COD:
2024 spring (expected)
Duration:
20
* Presumed live based on the expected COD.
Additional details
Hokuriku Electric Power Biz Energy Solution developed a new solar power plant in Shiranuka Town, Hokkaido to supply electricity to nine Hokuriku Bank and 33 Hokkaido Bank branches in Hokkaido
The PPA will account for approximately 25% of power consumption by the two banks’ Hokkaido branches
Construction on the power plants is expected to start in September 2023 with all of the stores expected to be supplied by power from this PPA in the spring of 2024
Image(s)
Hokuriku Electric Power Biz Energy Solution Co., Ltd.'s other PPAs
Disclosed
Offtaker
Model
MW DC
Multiple's other PPAs
Start typing and press enter to search
Submit the form below to receive a sample issue of The Japan Power Industry Executive.