PPA overview

Contract model and parties

Model:

Physical (hybrid on-/off-site)

Generator:

Mizuho-Toshiba Leasing Co., Ltd.

みずほ東芝リース株式会社

Retailer:

Nippon Steel Engineering Co.,Ltd.

日鉄エンジニアリング株式会社

Offtaker:

Nippon Steel Kowa Real Estate

日鉄興和不動産株式会社

Industry:

Real Estate

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

3.533MW (DC)

Inverter:

-

Generation:

3.99GWh/year

Status and timeline

Status:

Live

Disclosed:

September 4, 2023

COD:

September 1, 2023

Duration:

Undisclosed

Additional details

  • Mizuho-Toshiba Leasing built solar power plants on the rooftops of LOGIFRONT Urayasu (Urayasu City, Chiba Prefecture) and LOGIFRONT Sayama (Sayama City, Saitama Prefecture) logistics facilities owned by Nippon Steel Kowa Real Estate
  • The power plants have an output of 1.49MW DC and 2.043MW DC respectively
  • In addition to being consumed at the two facilities where the panels are installed, power from this PPA will also be supplied to four other properties owned by Nippon Steel Kowa Real Estate

Image(s)

Mizuho-Toshiba Leasing Co., Ltd.'s other PPAs

Nippon Steel Kowa Real Estate's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.