PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Summit Wind Corporation

サミットウインドパワー株式会社

Retailer:

Summit Energy Corporation

株式会社サミットエナジー

Offtaker:

JR Chuo Line Community Design

株式会社JR中央線コミュニティデザイン

Industry:

Real Estate

Capacity and generation

T&D area:

Tokyo

Technology:

Wind (Onshore)

Capacity:

20MW (DC)

Inverter:

-

Generation:

FIT-to-FIP:

Yes

Status and timeline

Status:

Live

*

Disclosed:

September 11, 2023

COD:

2023/10 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • Summit Energy will supply power generated at Summit Wind Power’s Kashima Wind Power Plant to multiple JR Chuo Line Community Design’s facilities including nonowa Musashi Sakai (EAST, WEST), Nonomichi Sakai, nonowa Higashi Koganei, nonowa Musashi Koganei
  • The power plant, located in Kashima City, Ibaraki Prefecture, that will be used for this PPA was commissioned in February 2007 under the FIT scheme and will be converted to the FIP scheme
  • JR Chuo Line Community Design will purchase additional renewable energy credits to make consumption at the facilities 100% renewable

Image(s)

Summit Wind Corporation's other PPAs