PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Mori Building Co., Ltd.

森ビル株式会社

Retailer:

TEPCO Energy Partner

東京電力エナジーパートナー株式会社

Offtaker:

Mori Building Co., Ltd.

森ビル株式会社

Industry:

Real Estate

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

12MW (DC)

Inverter:

-

Generation:

14.6GWh/year

Status and timeline

Status:

Live

*

Disclosed:

October 18, 2023

COD:

February 13, 2024 - 2025/02 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • As part of this PPA, Mori Building in cooperation with Ecokaku will, between FY2023 end and FY2024, develop six agrisolar power plants covering an area of approximately 10ha; grain, soybeans, and other crops will be grown at the power plants
  • The power plants will be located in Kuwayama (Chikusei City, Ibaraki Prefecture), Niisatocho (Kiryu City, Gunma Prefecture), Miyamachi (Tochigi City, Tochigi Prefecture), Gongendo (Satte City, Saitama Prefecture, two power plants), and Senzuka (Satte City, Saitama Prefecture)
  • The power will be supplied to Toranomon Hills Mori Tower and other “Hills” buildings operated by Mori
  • On February 13, 2024, “Mori Building Chikusei City Kuwayama Agricultural Solar Power Plant” became the first power plant to commence commercial operations as part of this PPA; the plant will generate approximately 0.280GWh/year, and the power will be supplied to Toranomon Hills Mori Tower
  • Once fully operational, the PPA is expected to cover approximately 10% to 15% of each Hills buildings’ consumption

Image(s)

Mori Building Co., Ltd.'s other PPAs

Mori Building Co., Ltd.'s other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.