PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Kanto YAWARAGI Energy Co., Ltd.

かんとうYAWARAGIエネルギー株式会社

Offtaker:

The Gunma Bank, Ltd.

群馬銀行

Industry:

Financial

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

0.1243MW (DC)

Inverter:

-

Generation:

0.124GWh/year

Status and timeline

Status:

Live

Disclosed:

October 31, 2023

COD:

March 28, 2024

Duration:

Undisclosed

Additional details

  • Kanto YAWARAGI Energy developed rooftop solar power plants at three Gunma Bank branches including:
    • Kiryu Branch (61.60kW, equivalent to 34% of consumption)
    • Annaka Branch (33.00kW, equivalent to 33% of consumption)
    • Nakanojo Branch (29.70kW, equivalent to 35% of consumption)

Image(s)

Kanto YAWARAGI Energy Co., Ltd.'s other PPAs

The Gunma Bank, Ltd.'s other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.