PPA overview

Contract model and parties

Model:

Physical (hybrid on-/off-site)

Generator:

Multiple

複数

Retailer:

PowerX, Inc.

株式会社パワーエックス

Offtaker:

Japan Post Co., Ltd.

日本郵政株式会社

Industry:

Logistics

Capacity and generation

T&D area:

Chugoku

Technology:

Solar

Capacity:

-

Inverter:

-

Generation:

Status and timeline

Status:

Unknown

Disclosed:

November 15, 2023

COD:

After 2024/08 (expected)

Duration:

Undisclosed

Additional details

  • PowerX will develop a combination of an off-site solar power plant and an on-site 2,132kWh battery storage at Japan Post’s Okayama Post Office in Soja City, Okayama Prefecture, allowing the supply of generated power at night
  • In August 2023, PowerX signed a contract with West Holdings, which will develop and operate solar power plants and BESS facilities on PowerX’s behalf

Multiple's other PPAs

Japan Post Co., Ltd.'s other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.