PPA overview

Contract model and parties

Model:

Virtual

Generator:

TESS Engineering Co., Ltd.

テス・エンジニアリング株式会社

Offtaker:

Mitsubishi Estate

三菱地所株式会社

Industry:

Real Estate

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

-

Inverter:

1.4MW (AC)

Generation:

1.7GWh/year

Status and timeline

Status:

Live

*

Disclosed:

November 15, 2023

COD:

2024 spring (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • TESS Engineering will build a solar power plant on Mitsubishi Estate-related facilities’ rooftops and sell the generated renewable energy credits to Mitsubishi Estate