PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Undisclosed

未公開

Offtaker:

Asahi Group Japan, Ltd.

アサヒグループジャパン株式会社

Industry:

F&B Manufacturing

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

2.651MW (DC)

Inverter:

-

Generation:

3.041GWh/year

Status and timeline

Status:

Live

Disclosed:

November 30, 2023

COD:

Undisclosed

Duration:

Undisclosed

Additional details

  • A solar power plant was developed on Asahi Breweries Ibaraki Factory in Moriya City, Ibaraki Prefecture
  • This PPA is expected to account for approximately 45% of the factory’s externally procured power