PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

SSD G.K.

合同会社SSD

Retailer:

Eneres Co., Ltd.

株式会社エナリス

Offtaker:

Retail Customers

小売事業顧客

Industry:

-

Capacity and generation

T&D area:

Chugoku

Technology:

Solar

Capacity:

1MW (DC)

Inverter:

0.495MW (AC)

Generation:

1.03GWh/year

Status and timeline

Status:

Live

Disclosed:

December 15, 2023

COD:

December 15, 2023

Duration:

20

Additional details

  • The power plants for this PPA were built in Hiroshima Prefecture and Yamaguchi Prefecture
  • The generator is a joint venture between Sun Village (power plant development), SAWADA (power plant system design, installation, maintenance), and DG Network (initiate collaborative discussions with the local government)
  • Eneres is a power retailer and balancing services provider that is part of the KDDI Group
  • The project is Sun Village Group’s first physical PPA in the Chugoku T&D zone area