PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Gogin Energy Co., Ltd.

ごうぎんエナジー株式会社

Offtaker:

Shoei Gakuen

学校法人翔英学園

Industry:

Education

Capacity and generation

T&D area:

Chugoku

Technology:

Solar

Capacity:

0.162MW (DC)

Inverter:

-

Generation:

0.12GWh/year

Status and timeline

Status:

Live

*

Disclosed:

December 19, 2023

COD:

2024/04 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • Gogin Energy will install a solar power plant on top of Yonago Kita High School’s gymnasium
  • The power will be consumed at the school and will account for about 21% of its annual consumption
  • Gogin Energy’s first PPA in the education industry

Image(s)

Gogin Energy Co., Ltd.'s other PPAs

Shoei Gakuen's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.