PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Yonko Solar Co., Ltd.

株式会社ヨンコーソーラー

Retailer:

Shikoku Electric Power Co., Ltd.

四国電力株式会社

Offtaker:

Shikoku Chemicals Corporation

四国化成工業株式会社

Industry:

Material Manufacturing

Capacity and generation

T&D area:

Shikoku

Technology:

Solar

Capacity:

2.035MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Live

*

Disclosed:

December 22, 2023

COD:

2025/02 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • Yondenko’s subsidiary Yonko Solar will develop a floating solar power plant on a reservoir in Miki Town, Kagawa Prefecture, and deliver the generated power to Shikoku Chemicals’ Tokushima Factory via Shikoku EPCO
  • The project will be supported by METI’s FY2023 subsidy for consumer-driven solar generation introduction

Yonko Solar Co., Ltd.'s other PPAs

Shikoku Chemicals Corporation's other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.