PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Multiple

複数

Offtaker:

Michi no Eki Munakata Co., Ltd.

株式会社道の駅むなかた

Industry:

Retail

Capacity and generation

T&D area:

Kyushu

Technology:

Solar

Capacity:

0.1083MW (DC)

Inverter:

-

Generation:

0.12GWh/year

Status and timeline

Status:

Live

Disclosed:

March 4, 2024

COD:

2024/02

Duration:

Undisclosed

Additional details

  • Nishimatsu Construction developed a rooftop solar power plant at Michi no Eki Munakata
  • The PPA is expected to account for approximately 12% of the facility’s consumption and lead to 70t per year CO2 emission reduction

Multiple's other PPAs

Michi no Eki Munakata Co., Ltd.'s other PPAs