PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Mitsubishi HC Capital Energy Inc.

三菱HCキャピタルエナジー株式会社

Offtaker:

FP Corporation

株式会社エフピコ

Industry:

-

Capacity and generation

T&D area:

Kansai

Technology:

Solar

Capacity:

1.479MW (DC)

Inverter:

-

Generation:

1.726GWh/year

Status and timeline

Status:

Live

Disclosed:

March 15, 2024

COD:

March 15, 2024

Duration:

Undisclosed

Additional details

  • Mitsui & Co. Plant Systems built a solar power plant on the rooftop of FP Corporation’s Kansai Factory/Kansai Hub Center in Ono City, Hyogo Prefecture, and handed it over to the PPA generator, Mitsubishi HC Capital Energy