Hokuriku Electric Power Biz Energy Solution Co., Ltd.
北陸電力ビズ・エナジーソリューション株式会社
Offtaker:
Takaoka City
高岡市
Industry:
Municipality
Capacity and generation
T&D area:
Hokuriku
Technology:
Solar
Capacity:
0.122MW (DC)
Inverter:
-
Generation:
0.122GWh/year
Status and timeline
Status:
Live
*
Disclosed:
March 25, 2024
COD:
July 15, 2024 (expected)
Duration:
20
* Presumed live based on the expected COD.
Additional details
Hokuriku EPCO’s subsidiary developed a solar power plant with 296 panels at an unused plot of land next to Takaoka Funeral Hall (Green Park) in Takaoka City, Toyama Prefecture
The PPA is expected to cover 10% of the facility’s consumption and reduce CO2 emissions by 54t per year
At the end of the contract period, the equipment ownership will be transferred to the city
Image(s)
Hokuriku Electric Power Biz Energy Solution Co., Ltd.'s other PPAs
Disclosed
Offtaker
Model
MW DC
Takaoka City's other PPAs
Start typing and press enter to search
Submit the form below to receive a sample issue of The Japan Power Industry Executive.