PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Ueno Gas Ueno House Consortium

上野ガス上野ハウス共同事業体

Offtaker:

Mie Prefecture

三重県

Industry:

-

Capacity and generation

T&D area:

Kansai

Technology:

Solar

Capacity:

0.1349MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Live

*

Disclosed:

March 26, 2024

COD:

April 1, 2024 (expected)

Duration:

20

* Presumed live based on the expected COD.

Additional details

  • Ueno Gas Ueno House Joint Venture led by Ueno Gas is constructing a new power plant and storage battery at the Iga Government Building in Mie Prefecture
  • This project is the first PPA to be done at a prefectural facility in Mie Prefecture

Image(s)

Ueno Gas Ueno House Consortium's other PPAs

Mie Prefecture's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.