PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

Undisclosed

未公開

Offtaker:

Showa Sangyo Co., Ltd.

昭和産業株式会社

Industry:

-

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

0.27MW (DC)

Inverter:

-

Generation:

0.5GWh/year

Status and timeline

Status:

Live

Disclosed:

March 29, 2024

COD:

2024/02

Duration:

Undisclosed

Additional details

  • A solar power plant was developed at Showa Sangyo’s Funabashi Factory in Funabashi City, Chiba Prefecture
  • The generated power is being consumed at the factory