PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TESS Engineering Co., Ltd.

テス・エンジニアリング株式会社

Offtaker:

Maniwa City

真庭市

Industry:

Municipality

Capacity and generation

T&D area:

Chugoku

Technology:

Solar

Capacity:

0.16788MW (DC)

Inverter:

-

Generation:

0.18GWh/year

Status and timeline

Status:

Live

Disclosed:

April 1, 2024

COD:

2024/04

Duration:

20

Additional details

  • TESS Engineering developed solar power plant at Hokubo Cultural Center and Maniwa Central Food Education Center in Maniwa City, Okayama Prefecture
  • The power plant on Hokubo Cultural Center will also supply power to the neighboring Hokubo Promotion Bureau
  • Both power plants use 580W Hanwha Q CELLS panels (204 and 57); the Maniwa Central Food Education Center power plant also uses 30 550W Toyo Aluminum panels

Image(s)

TESS Engineering Co., Ltd.'s other PPAs

Maniwa City's other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.