PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

SHONAI Inc.

株式会社SHONAI

Offtaker:

Kyodo Denshi Industries Co. Ltd.

株式会社協同電子工業

Industry:

-

Capacity and generation

T&D area:

Tohoku

Technology:

Solar

Capacity:

0.2998MW (DC)

Inverter:

-

Generation:

0.2779GWh/year

Status and timeline

Status:

Live

Disclosed:

April 3, 2024

COD:

2022/12/01

Duration:

20

Additional details

  • SHONAI built a rooftop solar power plant at Kyodo Electronics’ new Kitakayahara Factory in Tsuruoka City, Yamagata Prefecture
  • Approximately 70% of the generated power will be consumed at the factory with the remaining 30% to be potentially sold to a power company in the future
  • FD Co., Ltd. was in charge of the project’s EPC

SHONAI Inc.'s other PPAs

Kyodo Denshi Industries Co. Ltd.'s other PPAs