PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Nihon BSL Co., Ltd.

日本BSL株式会社

Retailer:

Marubeni Power Retail Corporation

丸紅新電力株式会社

Offtaker:

Aeon Tohoku Co., Ltd.

イオン東北株式会社

Industry:

Retail

Capacity and generation

T&D area:

Tohoku

Technology:

Solar

Capacity:

-

Inverter:

3.294MW (AC)

Generation:

Status and timeline

Status:

Live

Disclosed:

April 4, 2024

COD:

2024/04

Duration:

20

Additional details

  • Japan BSL will build solar power plants in 13 locations, including Fukushima Prefecture to supply power to four Aeon Tohoku stores (Aeon Ishinomaki, Aeon Morioka Minami, Aeon Omagari, and Aeon Iwaki)
  • The project received the FY2022 “consumer-led solar power introduction” subsidy from the Ministry of Economy, Trade and Industry

Nihon BSL Co., Ltd.'s other PPAs

Aeon Tohoku Co., Ltd.'s other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.