PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

Shikoku Electric Power Co., Ltd.

四国電力株式会社

Retailer:

Shikoku Electric Power Co., Ltd.

四国電力株式会社

Offtaker:

Okura Industrial Co., Ltd.

大倉工業株式会社

Industry:

Material Manufacturing

Capacity and generation

T&D area:

Shikoku

Technology:

Solar

Capacity:

-

Inverter:

-

Generation:

3.5GWh/year

Status and timeline

Status:

Live

*

Disclosed:

April 19, 2024

COD:

2025/02 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • Shikoku EPCO will build a floating solar power plant on a reservoir in Takamatsu City, Kagawa Prefecture, and deliver the generated power to Okura’s Plastic Film Division Marugame No. 4 Plant in Marugame City, Kagawa Prefecture

Shikoku Electric Power Co., Ltd.'s other PPAs

Okura Industrial Co., Ltd.'s other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.