PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TESS Engineering Co., Ltd.

テス・エンジニアリング株式会社

Offtaker:

Co-op Oita

生活協同組合コープおおいた

Industry:

Retail

Capacity and generation

T&D area:

Kyushu

Technology:

Solar

Capacity:

0.285MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Live

Disclosed:

May 15, 2024

COD:

2024/05

Duration:

Undisclosed

Additional details

  • TESS Engineering installed 560 510W Trina solar panels on Co-op Oita’s Co-op Minamikasuga store’s rooftop in Oita City, Oita Prefecture