PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TG Power Inc.

株式会社TGパワー

Offtaker:

Process Lab. Micron Co., Ltd.

株式会社プロセス・ラボ・ミクロン

Industry:

Electrical Manufacturing

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

0.198MW (DC)

Inverter:

0.15MW (AC)

Generation:

0.194GWh/year

Status and timeline

Status:

Live

Disclosed:

June 3, 2024

COD:

2024/06

Duration:

Undisclosed

Additional details

  • TG Power developed a rooftop solar power plant at Process Lab. Micron’s Kawagoe Technology Center in Kawagoe City, Saitama Prefecture