PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

The Kansai Electric Power Co., Inc.

関西電力株式会社

Retailer:

The Kansai Electric Power Co., Inc.

関西電力株式会社

Offtaker:

Hankyu Hanshin Holdings, Inc.

阪急阪神ホールディングス株式会社

Industry:

Conglomerate

Capacity and generation

T&D area:

Kansai

Technology:

Solar

Capacity:

0.99MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Upcoming

Disclosed:

June 28, 2024

COD:

FY2024 (expected)

Duration:

Undisclosed

Additional details

  • Kansai EPCO will gradually develop solar power plants from which it will supply power to Hankyu Hanshin-owned Takarazuka Grand Theater and Takarazuka Hotel in Takarazuka City, Hyogo Prefecture
  • Hankyu-Hanshin will procure renewable energy credits from Kansai EPCO to make power consumption at the two facilities 100% renewable from July 1, 2024

The Kansai Electric Power Co., Inc.'s other PPAs

Hankyu Hanshin Holdings, Inc.'s other PPAs

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.