PPA overview

Contract model and parties

Model:

Physical (off-site)

Generator:

The Kansai Electric Power Co., Inc.

関西電力株式会社

Retailer:

The Kansai Electric Power Co., Inc.

関西電力株式会社

Offtaker:

Hankyu Hanshin Holdings, Inc.

阪急阪神ホールディングス株式会社

Industry:

Conglomerate

Capacity and generation

T&D area:

Kansai

Technology:

Solar

Capacity:

0.99MW (DC)

Inverter:

-

Generation:

Status and timeline

Status:

Live

*

Disclosed:

June 28, 2024

COD:

FY2024 (expected)

Duration:

Undisclosed

* Presumed live based on the expected COD.

Additional details

  • Kansai EPCO will gradually develop solar power plants from which it will supply power to Hankyu Hanshin-owned Takarazuka Grand Theater and Takarazuka Hotel in Takarazuka City, Hyogo Prefecture
  • Hankyu-Hanshin will procure renewable energy credits from Kansai EPCO to make power consumption at the two facilities 100% renewable from July 1, 2024

The Kansai Electric Power Co., Inc.'s other PPAs

Hankyu Hanshin Holdings, Inc.'s other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.