PPA overview

Contract model and parties

Model:

Physical (hybrid on-/off-site)

Generator:

SMFL MIRAI Partners Co., Ltd.

SMFLみらいパートナーズ株式会社

Retailer:

Nippon Steel Engineering Co.,Ltd.

日鉄エンジニアリング株式会社

Offtaker:

YKK AP Inc.

YKK AP株式会社

Industry:

-

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

1.7MW (DC)

Inverter:

-

Generation:

1.17GWh/year

Status and timeline

Status:

Live

Disclosed:

July 4, 2024

COD:

2023/10

Duration:

Undisclosed

Additional details

  • Sumitomo Mitsui Finance and Leasing’s subsidiary SMFL Mirai Partners developed a solar power plant at YKK AP’s Saitama Factory’s new building in Misato Town, Saitama Prefecture, which commissioned as part of an on-site PPA in October 2023
  • In May 2024, the PPA was expanded so that in addition to the generated power being consumed at the new factory, a portion of the generated power would also be delivered to the factory’s old building and to YKK AP Saitama Window Factory with Nippon Steel Engineering serving as a retailer
  • The new hybrid on-/off-site mode will allow the company to use 100% of the generated power as opposed to approximately 50% before
  • The PPA is expected to result in a 512 t/year reduction in CO2 emissions

Image(s)

SMFL MIRAI Partners Co., Ltd. 's other PPAs

YKK AP Inc.'s other PPAs

Japan Energy Hub PPA Report

Submit the form to register CPPAs in 2025: Market Overview, Trends and Opportunities report’s “early bird” pricing.

Monthly Report - The Japanese Power Industry Executive

Submit the form below to receive a sample issue of The Japan Power Industry Executive.