PPA overview

Contract model and parties

Model:

Physical (on-site)

Generator:

TESS Engineering Co., Ltd.

テス・エンジニアリング株式会社

Offtaker:

Mitsubishi Estate

三菱地所株式会社

Industry:

Real Estate

Capacity and generation

T&D area:

Tokyo

Technology:

Solar

Capacity:

2.3MW (DC)

Inverter:

-

Generation:

1.9GWh/year

Status and timeline

Status:

Live

Disclosed:

July 16, 2024

COD:

2024/03

Duration:

20

Additional details

  • TESS Engineering developed a rooftop solar power plant at Logicross Sagamihara, a logistics facility in Sagamihara City, Kanagawa Prefecture, developed jointly by Mitsubishi Estate and Nippon Life Insurance
  • The power procured through this PPA is expected to lead to an 815t per year CO2 emission reduction

Image(s)

TESS Engineering Co., Ltd.'s other PPAs

Mitsubishi Estate's other PPAs

Monthly Report - The Japanese Power Industry Executive